自上料搅拌车厂家直销

品质创造未来,爱上中科聚峰造

全国咨询热线
400-879-1999
当前位置:首页 »新闻中心 » 常见问题自上料搅拌车防抱死系统故障及问题

自上料搅拌车防抱死系统故障及问题

来源:https://www.jfjiaobanche.com 浏览:0发表时间:2021-12-20
1.检查自上料搅拌车的停车制动器是否完全松动。
1. Check whether the parking brake of the self loading mixer is completely loose.
2.检查自上料搅拌车的制动罐液位是否符合本手册的要求。
2. Check whether the liquid level in the brake tank of the charging mixer meets the requirements of this manual.
3.检查自上料搅拌车的所有制动管路是否有损坏和泄漏迹象。
3. Check all brake pipelines from the charging mixer for damage and leakage.
4.检查防抱死系统中的所有保险丝是否完好,电线是否损坏,以及插座是否牢固。
4. Check whether all fuses in the anti lock system are intact, whether the wires are damaged and whether the sockets are firm.
5.检查电池容量和电压是否符合要求,以及正负极线之间的连接是否可靠。
5. Check whether the battery capacity and voltage meet the requirements and whether the connection between positive and negative wires is reliable.
6.检查防抱死系统和ECI_I连接器是否牢固连接。
6. Check anti lock system and ECI_ Check whether the I connector is firmly connected.
 自上料搅拌车哪家好
7.检查电路连接是否有腐蚀,损坏,松动或接触不良。ABS的每根接地线的接地是否可靠?
7. Check the circuit connection for corrosion, damage, looseness or poor contact. Is the grounding of each grounding wire of ABS reliable?
8.检查轮胎是否符合要求。
8. Check whether the tire meets the requirements.
9.检查自上料搅拌车的轮子是否转动,轮毂的轴承间隙是否正常。
9. Check whether the wheel of the self loading mixer rotates and whether the bearing clearance of the hub is normal.
自上料搅拌车的注意事项
Precautions for self loading mixer
在使用自上料搅拌车之前,您应该了解使用注意事项。
Before using the self loading mixer, you should first understand the precautions.
1.液压系统压力应符合手册中的要求,不应随意调整。液压油的质量和数量应符合原始要求。
1. The pressure of the hydraulic system shall meet the requirements in the manual and shall not be adjusted at will. The quality and quantity of hydraulic oil shall meet the original requirements.
2.在装载自上料搅拌车之前,应排出残留在搅拌筒中的残留水和碎屑。在运输过程中连续旋转,以防止混凝土分离。在自上料搅拌车到达施工现场并排出之前,搅拌机应以14-18 rpm的全速旋转1-2分钟,然后反向排出。停止自上料搅拌车并在倒车前不要转动。
2. Before loading from the loading mixer, the residual water and debris remaining in the mixing drum shall be discharged first. Continuous rotation during transportation to prevent concrete separation. Before arriving at the construction site from the loading mixer and discharging, the mixer shall rotate at full speed of 14-18 rpm for 1-2 minutes, and then discharge in the opposite direction. Stop the self loading mixer and do not rotate before reversing.
3.环境温度高于+25摄氏度。装载,运输和卸载的持续时间不得超过60分钟,环境温度应低于+25摄氏度。上述时间不得超过90分钟。
3. The ambient temperature is higher than + 25 ℃. The duration of loading, transportation and unloading shall not exceed 60 minutes, and the ambient temperature shall be lower than + 25 ℃. The above time shall not exceed 90 minutes.
4.工作时,请勿将手伸入旋转的搅拌桶中。严禁进入主卸料槽,延长卸料槽的接头,以免发生意外。
4. When working, do not put your hand into the rotating mixing bucket. It is forbidden to enter the main discharge chute and extend the joint of the discharge chute to avoid accidents.
5.日常工作后,驾驶员应负责将清洁水注入搅拌筒并高速旋转(14-18转/分钟)5-10分钟,然后排水以确保汽缸清洁。用高压水清洗搅拌筒的所有部件时,应注意避免使用仪器和操纵杆。压力水喷嘴与主体涂料表面之间的距离不应小于40厘米。
5. After daily work, the driver shall inject clean water into the mixing drum and rotate it at high speed (14-18 RPM) for 5-10 minutes, and then drain water to ensure the cleanness of the cylinder. When cleaning all parts of the mixing drum with high-pressure water, pay attention to avoid using instruments and control rods. The distance between the pressure water nozzle and the main coating surface shall not be less than 40 cm.
我们一直在坚持分享的路上自上料搅拌车哪家好https://www.jfjiaobanche.com真正为您您所需要的问题.
We always insist on sharing. Which is the best one to load the mixer https://www.jfjiaobanche.com Truly solve the problems you need