自上料搅拌车厂家直销

品质创造未来,爱上中科聚峰造

全国咨询热线
400-879-1999
当前位置:首页 »新闻中心 » 公司新闻全自动搅拌车效率怎么,提高生产效率!

全自动搅拌车效率怎么,提高生产效率!

来源:https://www.jfjiaobanche.com 浏览:0发表时间:2022-03-07
混凝土自动上料搅拌车能一车顶三车,高程度的实用性在工程机械市场掀起一股强有劲的“技术风”,市场越来越大。但仍有部分老铁质疑它的效率,下面我们就解锁混凝土自动上料搅拌车的效率问题。
The automatic concrete loading mixer can have one roof and three vehicles. The high degree of practicability has set off a strong "technical wind" in the construction machinery market, and the market is becoming larger and larger. However, some of the old fellow iron companies still doubt its efficiency. Now we will unlock the efficiency of the concrete automatic feeding mixer.
可以肯定的是,自上料搅拌车的效率是非常不错的,对中小工程来讲是再强不过的得力助手。下面以中科聚峰自上料搅拌车为例分析。
To be sure, the efficiency of self loading mixer is very good, and it is a powerful assistant for small and medium-sized projects. Take zhongkejufeng self loading mixer as an example.
一、平均每12分钟一罐料
1、 One can of material every 12 minutes on average
中科聚峰自上料搅拌车容量分别有1方、1.6方、2方、2.6方、3方、3.5方、4方,从上料、上水、搅拌开始,平均每12分钟搅制出一罐料,也就是说,每小时平均生产5罐料,每小时能生产混凝土20方混凝土。
The capacity of zhongkejufeng self loading mixer truck is 1m3, 1.6m3, 2m3, 2.6m3, 3m3, 3.5m3 and 4m3 respectively. Starting from loading, watering and mixing, a can of material is stirred every 12 minutes on average, that is, an average of 5 cans of material are produced per hour, and a maximum of 20 m3 of concrete can be produced per hour.
这效率较之前搅拌机+多名工人模式生产混凝土的方式而言,直接提高好几倍。
This efficiency is several times higher than the previous mode of mixer + multiple workers to produce concrete.
二、日产混凝土可达200方
2、 The daily output of concrete can reach 200 m3
按照开工8-10小时来算,中科聚峰自动上料搅拌车每天的混凝土出产量在160-200方之间,极大程度上满足了中小工程的日常所需。
According to 8-10 hours of commencement, the daily concrete output of Zhongke Jufeng automatic loading mixer is between 160-200 m3, which greatly meets the daily needs of small and medium-sized projects.
如若采用商混方式,且不说日益增长的费用,光是等待的时间也能将效率拉低许多,况且有的山区、高原等地的施工场所附近根本没有可寻的商混站,此,中科聚峰自上料搅拌车生产混凝土成了既效率又省成本的运作方式。
If the commercial mixing method is adopted, not to mention the increasing cost, the waiting time alone can also reduce the efficiency. Moreover, there are no commercial mixing stations near the construction sites in some mountainous areas, plateaus and other places. So far, Zhongke Jufeng's self loading mixer has become the best operation mode of both efficiency and cost saving.
另外,270度的旋转卸料功能也能提高不少效率,边运输,边卸料,工人用工具将其推平即可,在修路、建桥、自建住房、建厂房、打护坡、筑堤坝、打地基、打地坪等项目中表现尤为出色,效率值满格。
In addition, the 270 degree rotary unloading function can also improve a lot of efficiency. While transporting and unloading, workers can push it flat with tools. It is particularly excellent in road construction, bridge construction, self built housing, plant construction, slope protection, dam construction, foundation construction, terrace and other projects, and the efficiency value is full.
水泥搅拌车在我国经过20年的发展,技术越来越成熟,由当初的低效率,高能耗发展到今天低能耗,水泥搅拌设备市场在经历一次又一次的变革,随着现在房地产市场热潮的持续,水泥搅拌设备市场也在持续升温,现在搅拌机生产效率逐渐提高,在实际生产中还有提升效率的捷径呢?
After 20 years of development in China, the technology of cement mixer has become more and more mature. From the original low efficiency and high energy consumption to today's high efficiency and low energy consumption, the cement mixing equipment market is undergoing changes again and again. With the continuation of the upsurge of the real estate market, the cement mixing equipment market is also heating up. Now the production efficiency of mixer is gradually improved, Is there a shortcut to improve efficiency in actual production?
1、根据民用水泥搅拌机的生产能力及成品运输的距离、线路和道路条件,配备足够数量的运输车,一般按生产率需要数的1.2倍准备;
1. According to the production capacity of civil cement mixer and the distance, route and road conditions of finished product transportation, a sufficient number of transport vehicles shall be equipped, which are generally prepared according to 1.2 times of the required productivity;
2、影响水泥搅拌机设备生产率的因素除了拌制时间和时间利用系数是影响沥青混凝土搅拌设备生产宰的直接因素。另外还有很多相关因素,诸如生产组织、设备的管理和运转质量等,其中设备运行的技术状况、原材料和运输车辆的淮备对保证和提高生产率也有明显的作用;
2. In addition to mixing time and time utilization coefficient, the factors affecting the productivity of cement mixer equipment are the direct factors affecting the production of asphalt concrete mixing equipment. In addition, there are many related factors, such as production organization, equipment management and operation quality. Among them, the technical status of equipment operation, raw materials and transportation vehicles also play an obvious role in ensuring and improving productivity;
3、要加强对水泥搅拌设备的维修管理,保证设备处于良好技术状态,并符合法规定的要求,建立严格的维修检测制度和预防措施,做到及时修理;
3. Strengthen the maintenance management of cement mixing equipment, ensure that the equipment is in good technical condition and meets the requirements of the national environmental protection law, establish strict maintenance and inspection system and preventive measures, and repair in time;
4、为了不因特殊原因使水泥搅拌设备停工,应有足够容量的成品料储仓;
4. In order not to shut down the cement mixing equipment for special reasons, there shall be a finished product storage bin with sufficient capacity;
5、对原材料要取样检查,不同规格的骨料(包括粉料)要分别堆放,并做到防尘防雨。沥青加热要及时,保持一定温度。骨料储存量为每天用旦的5倍以上,粉料和沥青储存且为每天用量的2倍以上.
5. Raw materials shall be sampled for inspection, and aggregates of different specifications (including powder) shall be stacked separately to prevent dust and rain. The asphalt shall be heated in time and kept at a certain temperature. The storage amount of aggregate is more than 5 times of the daily consumption, and the storage amount of powder and asphalt is more than 2 times of the daily consumption