  中科搅拌机皮带秤的校准方法:将速度控制器上的“自动/手动”开关调到手动位置,将速度调到小电位计,打开主机和速度控制器的电源。15分钟后,启动皮带秤,调节速度控制器上的速度,让电位计使皮带运行(400-500 RPM),根据需要测试零点。按F3将光标移动到待校准的K值前面,再按F5将一些沙袋放在已知重量(累计重量> 100KG)的跑步带上。
  Calibration method of Zhongke mixer belt scale: adjust the "automatic / manual" switch on the speed controller to the manual position, adjust the speed to the small potentiometer, and turn on the power supply of the host and speed controller. After 15 minutes, start the belt scale, adjust the speed on the speed controller, let the potentiometer run the belt (400-500 RPM), and test the zero point as required. Press F3 to move the cursor to the K value to be calibrated, and press F5 to place some sandbags on the running belt with known weight (cumulative weight > 100KG).
中科搅拌机
  此时,以流的形式显示重量或沙袋的累积值,然后将重量或沙袋的重量发送给K值。道路的K值由微机决定。计算新的K值,以同样的方式校准2-3次,直到累积流量等于实际流量。其他道路标记方法与上述方法相同。
  At this point, the weight or the accumulated value of the sandbag is displayed as a stream, and then the weight or the weight of the sandbag is sent to the K value. The K value of the road is determined by the computer. Calculate the new K value and calibrate 2-3 times in the same way until the cumulative flow equals the actual flow. Other road marking methods are the same as above.
  螺旋电子秤的校准方式有两种:将速度控制器上的“自动/手动”开关置于手动位置,将给定电位计的速度调节到较小的速度,启动螺旋电子秤。先将水泥内部清洗干净,然后按零位测量法进行零位测量。按F3将光标移动到第7个K值的前面,按F5调整给料机控制的速度,使电位器旋钮可以取下。同时拧紧螺丝和电子秤,使其在出口处排出。水是稳定的。搅拌站搅拌带完成后,按回车键,将物料的实际重量发送到K值。按Enter确认。这是K值自动生成一个新的K值的地方,以同样的方式校准。完成校正工作,直累积重量等于实际重量为止。
  There are two ways to calibrate the screw scale: set the "auto / manual" switch on the speed controller to the manual position, adjust the speed of the given potentiometer to a smaller speed, and start the screw scale. First, clean the inside of the cement, and then measure the zero position according to the zero position measurement method. Press F3 to move the cursor to the front of the 7th K value, and press F5 to adjust the speed of feeder control so that the potentiometer knob can be removed. At the same time, tighten the screws and the scale to make it discharge at the outlet. Water is stable. After the mixing belt of the mixing station is completed, press enter to send the actual weight of the material to K value. Press enter to confirm. This is where the K value automatically generates a new K value, calibrated in the same way. Complete the calibration until the accumulated weight is equal to the actual weight.
  混凝土搅拌机水的标定方法:水的标定方法简单,因为系统采用水表,即高精度电子计量水表。将每公斤水表对应的脉冲量发送到第九路的K值是很重要的。是的,例如,我们的工厂使用Φ40套水等于每公斤22脉冲。因此,将第9个k值改为22,完成校准。第九个“时间”是水的百分比,零点是水的跟踪系数。延迟就是加水的延迟。在使用道路时,六路不能连接皮带秤。水路的自动DA值由道路输出。
  Concrete mixer water calibration method: water calibration method is simple, because the system uses water meter, that is, high-precision professional electronic metering water meter. It is important to send the pulse corresponding to the water meter per kilogram to the K value of the Ninth Circuit. Yes, for example, our factory uses Φ 40 sets of water equal to 22 pulses per kilogram. Therefore, change the 9th K value to 22 to complete the calibration. The Ninth "time" is the percentage of water, and the zero point is the tracking coefficient of water. Delay is the delay of adding water. When using the road, six ways cannot be connected to the belt scale. The automatic Da value of the waterway is output by the road.
  以上是中科搅拌机厂家为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:https://www.jfjiaobanche.com
  The above is the relevant content introduced by the mixer manufacturer of China Science and Technology Co., Ltd. for more information, please visit the website: https://www.jfjiaobanche.com