每次我们操作全自动搅拌车时,水都是用于正常工作的重要材料,因此,在装填所生产的混凝土之前,每次都应加水。那么搅拌车进行供水操作时要注意什么?全自动搅拌车厂家为您解答。
Every time we operate the automatic mixer, water is an important material for normal work. Therefore, water should be added every time before the concrete produced is loaded. So what should be paid attention to when the mixer truck is operating for water supply? The manufacturer of the fully automatic mixer will answer for you.
采用水泵供水:
Water is supplied by water pump:
a、先打开驾驶室里的水泵翘板开关,再打开蜂鸣开关,水泵即可工作,同时,蜂鸣器发出“嘟嘟嘟”的叫声;
a. First turn on the rocker switch of the water pump in the cab, then turn on the buzzer switch, and the water pump can work. At the same time, the buzzer gives a "beep beep" sound;
b、向搅拌筒内加水或冲洗料斗槽时,开启“料斗”阀门;
b. When adding water to the mixing drum or flushing the hopper tank, open the "hopper" valve;
c、冲洗出料溜槽时,开启溜槽阀们;
c. When flushing the discharge chute, open the chute valves;
d、冲洗车身时,先开启水枪阀门,而后可直接使用车尾水枪;采用气压供水:
d. When washing the body, first open the water gun valve, and then directly use the tail water gun; Pneumatic water supply:
①先打开驾驶室供气开关,当主车压力表达到8kg/cm2压力再打开供水系统手动气开关,当压力表达到2kg/cm2压力时即可工作。
① First turn on the air supply switch in the cab. When the main vehicle pressure reaches 8kg/cm2, turn on the manual air switch of the water supply system. When the pressure reaches 2kg/cm2, it can work.
②向搅拌筒内加水,冲洗料斗槽、卸料槽时,先开启水箱底部阀门,再开启“料斗”阀门。
② When adding water to the mixing drum and flushing the hopper tank and discharge tank, first open the valve at the bottom of the water tank, and then open the "hopper" valve.
③冲洗车身时,先开启水箱底部阀门,后直接使用车尾冲洗装置。
③ When washing the body, first open the valve at the bottom of the water tank, and then directly use the rear washing device.
此外搅拌罐中应泵入多少气压,该压力已在工厂设定,无需调整。如果有特殊情况需要调整,建议将压力控制在3.5Mpa左右,如果压力过高,很容易爆炸。此外,在日常使用新的混凝土搅拌车中,有必要随时拧紧管接头以防止其脱落。
In addition, how much air pressure should be pumped into the mixing tank, which has been set in the factory and does not need to be adjusted. If adjustment is required under special circumstances, it is recommended to control the pressure at about 3.5Mpa. If the pressure is too high, it is easy to explode. In addition, in the daily use of new concrete mixer trucks, it is necessary to tighten the pipe joints at any time to prevent them from falling off.
每个搅拌车供水的布置都相似。通常,水箱中的水装满后,关闭填充阀。在不用时,将操纵杆的位置放在中间。冬季每天结束工作后,应将水箱和水管中的水排干,并使用水管中的压缩水吹掉每根管子中的残留水,以防止水管结冰后破裂。
The arrangement of water supply for each mixer truck is similar. Normally, when the water tank is full, close the filling valve. When not in use, place the lever in the middle. At the end of each day's work in winter, the water in the water tank and water pipe shall be drained, and the compressed water in the water pipe shall be used to blow off the residual water in each pipe to prevent the water pipe from cracking after freezing.
作为厂家,我们建议您在使用全自动搅拌车时保持一个好的使用习惯,及时冲洗和进行各种准备工作可减少搅拌车的故障发生。更多相关内容就来我们网站https://www.jfjiaobanche.com咨询吧!
As a manufacturer, we recommend that you keep a good usage habit when using the fully automatic mixer. Timely flushing and various preparations can reduce the occurrence of mixer failures. More relevant content will come to our website https://www.jfjiaobanche.com Consult!